Phase 1 of MediaCityUK includes a brand new tram terminus, which will bring you right onto the MediaCityUK piazza. This will be in addition to the existing tram stop at Broadway, which already provides Eccles and city centre-bound services every 12 minutes. For drivers, a new link road with the M602 motorway will give you the option of approaching MediaCityUK from either end of Broadway. And for those of you who prefer pedal power, we’re installing around 300 cycle bays at locations around the site.